Airport Construction
Southport continues to invest in our airport each year through ongoing capital projects. Some of our most recent projects include:
- Drainage around Apron 1B was improved in 2016
- Airfield Lighting Control System (ALCS) was replaced in 2016
- The Instrument Landing System (ILS) was replaced in 2015
- Apron I reconstruction in 2014, which included 11 acres of asphalt paving
- Upgrades were made to the field electrical centre in 2014